The HANTRU-1 cable is 2,917 km long with a 160 Gbps design capacity, extended to Majuro and Kwajalein/Ebeye in 2010, linking to a Pohnpei hub and onward to Guam. A 2017 HANTRU-1 cable fault caused a nationwide 3-week outage, forcing a 97% bandwidth cut as the islands relied on limited satellite links. The East Micronesia…
Read more