Today: 20 March 2026
Browse Category

TADAWUL:2082 22 October 2025

Bahrain’s First Solar Power Plant: 150MW Tender to Power 6,300 Homes & Slash 100,000t CO₂

Bahrain’s First Solar Power Plant: 150MW Tender to Power 6,300 Homes & Slash 100,000t CO₂

Bahrain’s Electricity & Water Authority opened bidding for its first large-scale solar plant, a 150 MW PV project in Bilaj Al Jazayer, on October 16, 2025. The plant will cover 1.2 km², supply power for about 6,300 homes, and cut 100,000 tonnes of CO₂ yearly. Bids are due by December 28, with commercial operation targeted for Q3 2027. The project will more than double Bahrain’s current solar capacity.

Stock Market Today

  • GraniteShares 3x AMD ETP (3LAM.PA) Surges 11.3% Pre-Market on Euronext
    March 19, 2026, 11:10 PM EDT. 3LAM.PA, GraniteShares 3x Long AMD Daily ETP, surged 11.30% pre-market to EUR 0.22 on Euronext amid heightened volume of 367,263 shares. The rally was fueled by investor demand for leveraged exposure to AMD, reflecting momentum in AMD derivatives and sector flows. Technical indicators signal a strong trend with an ADX of 37.18 but an oversold RSI of 29.67. The ETP's elevated intraday volatility and low liquidity pose risks including widened spreads and tracking errors, typical for products with daily leveraged resets. Meyka AI rates the instrument a Hold with a grade C+, citing volatility, small market cap of EUR 1.52 million, and reliance on AMD performance. Traders are advised to use caution with position sizes and limit orders, especially amid semiconductor sector fluctuations.
Go toTop