Browse Tag

Artemis

NASA’s “Astronaut Avatars” – Tiny Organ Chips Poised to Protect Artemis II Crew’s Health

SpaceX’s Moon Mission in Jeopardy as NASA Opens Artemis Contract to Rivals

NASA Reopens Moon Lander Contract Amid SpaceX Delays NASA’s surprise move to reopen the Artemis III lunar lander contract marks a dramatic shift in the U.S. return-to-the-Moon effort. Acting NASA Administrator Sean Duffy – who also serves as U.S. Transportation Secretary – revealed on Monday that NASA will no longer rely exclusively on SpaceX for the planned Moon landing mission. “I’m in the process of opening that contract up,” Duffy said, explaining that SpaceX’s development schedule has slipped too much reuters.com. SpaceX’s Starship rocket was originally slated to carry astronauts from lunar orbit to the surface in late 2025 or 2026,
20 October 2025
Race to Drive on the Moon: Inside the Battle for NASA’s Artemis Lunar Rover Contract

Race to Drive on the Moon: Inside the Battle for NASA’s Artemis Lunar Rover Contract

The New Moon Buggy Race for Artemis Three competing lunar rover prototypes on display at NASA’s Johnson Space Center: (L–R) Venturi Astrolab’s FLEX rover, Intuitive Machines’ Moon RACER, and Lunar Outpost’s Eagle LTV. NASA is once again in the market for a Moon rover – and this time it’s turning to private industry. Under the Artemis program, which aims to return humans to the Moon and eventually send crewed missions to Mars, NASA issued a call for next-generation lunar vehicles that astronauts can drive on the Moon’s surface. The agency’s Lunar Terrain Vehicle (LTV) will be an unpressurized, “open-top” rover akin
5 September 2025
Historic Vulcan Launch, Artemis Moon Hardware & Perseid Meteor Spectacle – Space News Roundup (Aug 11–12, 2025)

Historic Vulcan Launch, Artemis Moon Hardware & Perseid Meteor Spectacle – Space News Roundup (Aug 11–12, 2025)

The Orion Stage Adapter for Artemis II was completed at NASA’s Marshall Space Flight Center and will ship to Kennedy Space Center, with Artemis II planned as a 10-day crewed lunar trip around the Moon by April 2026. NASA announced Phase 2 of its LunaRecycle challenge offering up to $2 million in prizes to prototype recycling systems for a lunar base, with finalists demonstrating their tech in August 2026. NASA awarded a $3.6 billion contract to KBR Wyle Services LLC to support astronaut health and performance research through 2035, covering programs at Johnson Space Center from the ISS to Artemis.
Space Race Heats Up: Russia’s 21-Satellite Launch, Amazon’s $140 M Bet, and a New Artemis Ally

Space Race Heats Up: Russia’s 21-Satellite Launch, Amazon’s $140 M Bet, and a New Artemis Ally

On July 25 at 1:54 a.m. ET, a Soyuz-2.1b from Russia’s Vostochny Cosmodrome lofted 21 satellites into orbit, including two Ionosfera-M space weather satellites, Iran’s Nahid-2, and 18 rideshares. The four Ionosfera-M satellites will provide three-dimensional near-Earth space coverage to study solar wind effects on radio communications and satellites, with the first two launched in late 2024. Amazon announced a $139.5 million investment to accelerate Project Kuiper, including a new 100,000-square-foot payload processing facility at Kennedy Space Center that opened in April. Senegal joined the Artemis Accords on July 24, becoming the 56th signatory to commit to peaceful, transparent space
25 July 2025
 ·  ·  ·  ·  · 
Go toTop