Today: 9 June 2026
IREN Stock Today (Sept 26, 2025): AI Cloud Moonshot Meets Wall Street Reality Check—Is the Rally Just Pausing or Running Out of Fuel?
26 September 2025
7 mins read

IREN Stock Today (Sept 26, 2025): AI Cloud Moonshot Meets Wall Street Reality Check—Is the Rally Just Pausing or Running Out of Fuel?


Key facts (as of 14:27 UTC, Sept 26, 2025)

  • Ticker / Exchange: IREN (Iren Limited) — NASDAQ.
    Price: $40.20, intraday –13.2%day range: $40.20–$45.33; prev close: $46.29. Bitcoin (BTC): ~$109,107 (–2.1%).
  • Market cap: ~$12.6B52‑week range: $5.13–$49.30; Shares outstanding: ~272M. Forward P/E: ~46; P/S (TTM): ~25.1. 
  • Today’s headline: JPMorgan downgraded IREN to Underweight (from Neutral) and raised its target to $24(from $16). Shares fell pre‑market and extended losses intraday. 
  • This week’s catalysts:
    • Bernstein hiked its target to $75, citing an AI‑cloud pivot (est. 80% upside).
    • Arete Research initiated Buy with $78 target.
    • Roth Capital raised its target to $82 (Buy). 
  • Company move (Sept 22): IREN doubled AI Cloud capacity to 23,000 GPUs via a $674M purchase (Nvidia B200s/B300s/GB300s and AMD MI350Xs). New ARR target: >$500M by Q1’26
  • Operations snapshot: Data centers powered by 100% renewable energy across Canada & TexasBitcoin self‑mining ~50 EH/spower & land portfolio ~2,910 MW810 MW operating
  • FY2025 results (year ended June 30): Revenue ~$501M; Net income ~$86.9M (first profitable year); strong balance‑sheet growth. 
  • Short interest (most recent Nasdaq data): ~28.2–31.0M shares (~11–13% of float); days to cover ≈1

The story today (Sept 26, 2025)

IREN shares are sharply lower after JPMorgan cut the stock to Underweight, even as it lifted its price target to $24 from $16—a call that implies sizable downside from recent levels following a torrid run. The note, summarized by multiple outlets, frames valuation as stretched relative to execution risk in high‑performance compute (HPC) build‑outs. 

At the same time, the AI narrative remains front and center. Industry trade press today reiterated IREN’s GPU expansion to 23k units and near‑term liquid‑cooled GB300 NVL72 deployments at its Prince George campus—details that buttress management’s push to turn spare power and real estate into AI cloud revenue. 

Macro doesn’t help: Bitcoin is hovering near $109k intraday, adding volatility to miner shares.


What moved the stock this week (last few days)

  • Fri, Sept 26: JPMorgan downgrade to Underweight, target $24; stock sells off. 
  • Wed–Thu, Sept 24–25: Bernstein lifts target to $75 (from $20), arguing the AI cloud build‑out could support $500M ARR by early 2026; shares jump double digits. Arete Research initiates Buy with $78 PT. Roth Capitalhikes PT to $82 (Buy). 
  • Mon, Sept 22: Company press release—IREN doubles AI Cloud to 23k GPUs, spending $674M and targeting >$500M ARR by Q1’26; stock pops despite a crypto sell‑off. 
  • Late Aug: FY25 results show profitability and Nvidia Preferred Partner status; incremental purchases of GB300 NVL72 and B300 GPUs; foundation for AI cloud scale‑up. 

Company & fundamentals—where IREN stands

What it is: IREN (formerly Iris Energy) develops and operates renewable‑powered, grid‑connected data centersoptimized for Bitcoin mining and AI compute (AI cloud and AI‑ready data centers). Sites include Canal Flats, Mackenzie, Prince George (Canada) and Childress, Texas

Financials: For FY2025 (ended June 30), IREN reported roughly $501M revenue and $86.9M net income, a major swing from prior losses and reflecting both higher BTC prices and scaled operations. Market cap sits near $12.6Bforward P/E ~46P/S ~25—rich multiples that now hinge on AI execution. 

Balance‑sheet & scale: Management says it has ~2,910 MW of grid‑connected power secured and ~810 MW of operating data centers, giving headroom to deploy tens of thousands of GPUs without waiting years for new substations or land. Bitcoin self‑mining capacity is ~50 EH/s


The AI cloud pivot—what changed in September

On Sept 22, IREN said it doubled its AI cloud fleet to 23,000 GPUs (mix of Nvidia B200/B300/GB300 and AMD MI350X) via a $674M order, and raised its AI Cloud annualized run‑rate target to >$500M by Q1’26. Delivery is staged over the coming months at Prince George (BC). Management’s rationale: customer contracts are increasingly signed ahead of delivery, improving visibility. 

  • CEO voice: “As global demand for compute accelerates, customers are increasingly seeking partners who can deliver scale quickly,” said Co‑CEO Daniel Roberts, adding that pre‑contracting is shifting in IREN’s favor. GlobeNewswire

A few weeks earlier, IREN disclosed Nvidia Preferred Partner status and liquid‑cooled GB300 NVL72 systems; it also noted construction of a 10MW liquid‑cooled installation designed to support >4,500 GB300s at Prince George. 

Leadership: On Sept 8, IREN named Anthony Lewis (ex‑Macquarie) as CFO. Co‑CEO Roberts praised his work on GPU financing and capital structure—important as the firm leans on non‑dilutive leases and project financing to scale AI. 


Bitcoin mining still matters

Even with the AI pivot, mining remains material. The August FY25 results and subsequent coverage highlighted ~50 EH/s installed self‑mining capacity and a pathway to >$1B annualized mining revenue under then‑current economics, though that figure is inherently variable with BTC price/difficulty. 

Key dependency: IREN’s equity beta to Bitcoin price remains high—BTC is near $109k today—which amplifies swings around analyst calls and AI headlines.


What Wall Street is saying (and the spread is wide)

  • Bullish camp:
    Bernstein: Target $75Outperform—believes IREN’s AI cloud build‑out could deliver $500M ARR by early 2026; the firm’s sum‑of‑parts view attributes the majority of value to AI/HPC, not mining. 
    Arete Research: Initiated Buy$78 PT (Sep 24), citing upgraded fleets and self‑funded data‑center expansions. 
    Roth CapitalBuy, target $82 (Sep 23) after IREN again expanded GPU purchases and ARR ambitions. 
  • Cautious/defensive camp:
    JPMorganUnderweight, target $24 (Sep 26), flagging valuation and execution risk as the company pivots into AI cloud. 
  • Consensus snapshots (vary by aggregator):
    Several trackers show average 12‑mo targets in the high‑30s to low‑40s, with highs $75–$82 and lows $20–$24—a very wide dispersion reflecting execution and cycle risk. 

Valuation & positioning (today’s lens)

At ~$40, IREN trades at about 46× forward earnings and ~25× TTM sales—multiples that embed meaningful AI contributions in the near‑to‑medium term. Relative to traditional miners, that’s rich, but relative to AI/HPC data‑center peers, it leans more story‑driven than cash‑flow‑driven for now. The short interest (~11–13% of float) can deepen both rallies and drawdowns. 


Risks to watch

  1. Execution & timing: Management’s >$500M AI Cloud ARR by Q1’26 is not fully contracted; delivery/commissioning, customer uptake, and pricing can vary. (Company’s forward‑looking statements underscore this.) 
  2. Capital intensity & financing: Scaling liquid‑cooled GB300 NVL72 clusters and power upgrades is expensive; while IREN has tapped non‑dilutive leases, future financing mix and rates matter. 
  3. Power & infrastructure: Despite a multi‑GW portfolio, local build timelines, cooling, and interconnects can impede ramp speed. 
  4. Crypto exposure: BTC price/difficulty and curtailment events can swing mining margins—and investor sentiment.
  5. Valuation reset risk: As today showed, a single downgrade can knock a high‑multiple, high‑expectation stock back quickly. 

What could change the narrative next (near‑term catalysts)

  • Contract wins or utilization disclosures for the 23k‑GPU fleet (or indications of pre‑contracted capacity). 
  • Commissioning milestones at Prince George (liquid‑cooled GB300 NVL72s), plus any Texas site updates. 
  • Monthly operating updates (AI cloud revenue, BTC mined, power costs), and FY26 Q1 commentary. 
  • Macro: BTC direction (still >$100k), rates/inflation (affects financing), and GPU supply dynamics.

Expert voices (direct quotes)

  • Daniel Roberts (Co‑Founder & Co‑CEO, IREN): “As global demand for compute accelerates, customers are increasingly seeking partners who can deliver scale quickly.” (On doubling to 23k GPUs and pre‑contracting momentum.) GlobeNewswire
  • Roberts on Nvidia partnership & financing: “We are pleased to have secured NVIDIA Preferred Partner status and additional non‑dilutive GPU financing, enabling us to expand our cloud offering with liquid‑cooled, next‑generation NVIDIA GB300 NVL72 systems.” GlobeNewswire
  • On leadership & capital markets (Roberts on new CFO): “Anthony has been a great addition… [he] has overseen our recently announced GPU financings… and is leading the continued evolution of our capital structure.” GlobeNewswire

(Analyst notes today summarized JPMorgan’s valuation concerns; the bank’s report text isn’t publicly quoted, but multiple outlets confirm the downgrade and $24 target.) 


Bottom line

  • Bull case: IREN leverages renewable‑powered campusespower at scale, and Nvidia‑aligned supply to ramp AI cloud quickly—shifting investor focus away from mining cyclicality. That’s the essence of the Bernstein/Arete/Roth view and why targets now cluster as high as $75–$82
  • Bear case: Today’s JPMorgan call is a reminder that the stock’s multiple presumes on‑time delivery, high utilization, and attractive pricing—all before cash flows fully prove out. Any hiccup in power, cooling, supply chains, or customer demand could force a rerating

For now, IREN is a high‑beta, execution‑sensitive AI/HPC build‑out wrapped in a Bitcoin miner’s body. Expect volatility to remain elevated as the company converts MW and GPUs into signed workloads and recurring cash—or not.


Sources & further reading

  • Live market data: IREN price/volume; BTC price.
  • Reuters Company Snapshot (key metrics & financials): market cap, multiples, shares out; company profile. 
  • Company releases:
    • Sept 22, 2025: “IREN Doubles AI Cloud to 23k GPUs, Raises AI Cloud ARR target to >$500m.” GlobeNewswire
    • Aug 28, 2025: “IREN Expands AI Cloud to 10.9k GPUs, Nvidia Preferred Partner…” GlobeNewswire
    • Aug 28, 2025: FY25 results (profitability; revenue). GlobeNewswire
    • Sept 8, 2025: CFO appointment. GlobeNewswire
  • Analyst actions:
    JPMorgan downgrade to Underweight, PT $24
    Bernstein raises PT to $75 (Outperform). 
    Arete Research initiates Buy, PT $78
    Roth Capital raises PT to $82 (Buy). 
  • Coverage & trade press:
    DataCenterDynamics on GPU/GB300 build‑out specifics. DataCenterDynamics
    IBD recap on expansion & stock reaction. Investors
    Yahoo/Motley Fool on “Why Iren Stock Surged Higher This Week.” Yahoo Finance

This report is for information only and not investment advice. Figures reflect sources cited as of Sept 26, 2025 and may update intraday.

Stock Market Today

  • ScanTech AI Systems to Be Delisted from Nasdaq
    June 9, 2026, 6:35 AM EDT. ScanTech AI Systems Inc. will be removed from the Nasdaq Stock Market listing, according to a Form 25 filing submitted on June 8, 2026. The delisting notification was certified by Nasdaq under the Securities Exchange Act of 1934. The company's common stock will no longer trade on the exchange as it meets requirements for delisting under federal securities regulations. This move follows formal procedures overseen by the Securities Exchange Commission (SEC), ensuring compliance with regulatory standards. ScanTech AI Systems is headquartered in Buford, Georgia.

Latest articles

Keel Infrastructure Shares Climb Premarket on $400M AI Power Deal

Keel Infrastructure Shares Climb Premarket on $400M AI Power Deal

9 June 2026
Keel Infrastructure surged 3.18% premarket to $5.84 as investors weighed a $400 million upsized convertible note sale to fund its AI data-center pivot, with notes convertible at $7.41—25% above last week’s close. The stock is up 529.59% year-over-year but remains volatile amid execution, permitting, and dilution risks, as analysts cite progress on key HPC/AI projects and the sector draws attention for power access.
Apple falls after Siri AI event and Wall Street stays cautious

Apple falls after Siri AI event and Wall Street stays cautious

9 June 2026
Apple shares fell 1.9% to $301.54 after its WWDC keynote and slipped further premarket as investors questioned how quickly the new Siri AI overhaul will drive revenue, with analysts split on Apple’s reliance on partners like Google and Nvidia, limited initial rollout, and lack of a clear AI monetization plan.
Nasdaq Futures Rise Ahead of CPI; Tech Buyers Step In

Nasdaq Futures Rise Ahead of CPI; Tech Buyers Step In

9 June 2026
Nasdaq 100 futures jumped 0.76% premarket, leading U.S. stock futures higher as investors bought back into tech after a chip-led rebound, but looming May CPI data Wednesday could threaten gains if inflation runs hot and revives rate-hike fears.
Qualcomm Shares Trade Early As AI Gets Attention Over Phones

Qualcomm Shares Trade Early As AI Gets Attention Over Phones

9 June 2026
Qualcomm surged 3.3% to $225.00 in early premarket trading after Nvidia CEO Jensen Huang publicly praised the company and J.P. Morgan raised its price target to $265, as investors focus on Qualcomm’s June 24 investor day and its push into AI and data-center chips beyond handsets.
Why Applied Digital Stock Is Jumping Before the Open After $5.2B AI Lease

Why Applied Digital Stock Is Jumping Before the Open After $5.2B AI Lease

9 June 2026
Applied Digital surged 8.7% in after-hours trading after announcing a 15-year, $5.2 billion lease at its Delta Forge 2 AI data center, boosting its contracted base-term lease revenue to $36 billion; investors are watching Tuesday’s regular session for the first full market reaction as confidence grows in Applied Digital’s ability to secure long-term AI infrastructure deals.
Tesla Phone 2025? Fresh Fact‑Checks, Starlink’s Mega Spectrum Deal — and Why There’s Still No ‘Model Pi’
Previous Story

Tesla Phone 2025? Fresh Fact‑Checks, Starlink’s Mega Spectrum Deal — and Why There’s Still No ‘Model Pi’

You Won’t Believe What Google Did This Month: July 2025’s Biggest Stories
Next Story

Google Turns 27: The Shocking Rise of a Garage Project into a Tech Titan

Go toTop